Sunday, March 21, 2021

Utah Update!

It's not a big update because they are still waiting for the furnace to arrive but several things are getting done.  The electrical wiring is in.  The cabinets are on their way.  The flooring is ready to go and the fireplace is ready to be installed once the insulation and wallboards get done.  Cathy adjusted her kitchen design and included a picture of her fireplace design.  They have started getting the entryway ready for the updates as well.  




No comments:

Post a Comment